Combined Cycle Cogeneration Plant includes:
- 47 Megawatt Electrical Generation
- Combustion Turbines, Heat Recovery Steam Generators (HRSG), and Back Pressure Steam Turbines
- 324,000 PPH Superheated Steam at 750°F, 600 PSIG
- 100,000 PPH Back-up Boiler at 250 PSIG Saturated
- Induction and Synchronous Generators
- 13.8 kV, 4.16 KV Volt, 480 Volt, and 120 Volt Plant Electrical Systems
- 138 KV Utility Interconnect Chilled Water Plant includes:
- 7,200 Tons Refrigeration Capacity
- Electric Centrifugal Chillers and Steam Absorption Chillers
- Natural Gas Engine Driven Centrifugal Chiller
- High Delta-T, Variable-Primary-Flow (VPF) cooling design
- Cooling Tower System
Henneman Engineering’s Industrial Technology Group was the Owners’ Engineers and Detail Design Engineers. We completed:
- Energy Analysis and Financial Payback
- Design from the Conceptual Stages
- Process Design
- Process Flow
- Detail Design
- Site Survey and Development Plan
- EPA Permitting
Total Construction Budget:
$55,000,000
Completion Date:
2000