U.S. Dept. of Energy, Fermi Laboratory
Batavia, Illinois
Henneman Engineering provided mechanical design and energy calculations for the closed loop geothermal well field adjacent to the OTE building. The OTE building is approximately 47,000 square feet, and will house offices, an industrial incubator, and conference spaces. Our work as the engineer was to size the closed loop geothermal well field to provide the necessary heat sink for the building’s HVAC system. The design consisted of 36 vertical deep wells 490 feet deep. A test well was drilled on site to determine actual energy transfer characteristics of the soils.
Total Construction Budget
$16,000,000
Additional Laboratory Projects
-
University of Illinois, Veterinary Medicine
Urbana-Champaign, Illinois -
Blackburn College, Olin Science Building
Carlinville, Illinois -
Iowa State University, Hatch Hall Chemistry Building
Ames, Iowa -
Iowa State University, Veterinary Medical Research Institute
Ames, Iowa -
U.S. Dept. of Energy, Fermi Laboratory
Batavia, Illinois -
Iowa State University, Crop Genomics Information Laboratory
Ames, Iowa