Harvey Hall is a four-story, academic and office building on the University of Wisconsin-Stout campus. The interior of Harvey Hall was renovated from top to bottom and restored to its original architectural character. The project modernized classroom and laboratory facilities with technology systems to encourage active learning. The goal of the project was to bring the building into the modern age while preserving the historical features and fixtures of the building. During the construction phase, the team found original lighting fixtures in the basement, which were restored and installed in the newly renovated Harvey Hall.
Henneman Engineering provided commissioning services as well as mechanical, electrical, plumbing, fire protection, and information technology engineering services.
Modernized Systems/Restored Character
- Replaced and upgraded all mechanical, electrical, telecommunications and life safety systems
- Improved ADA accessibility
- Installed automatic sprinkler system
- Added a second elevator
- Replaced roof
- Restored 4th floor skylights
- Removed drop ceilings to restore 13-foot ceilings in hallways
- Reconfigured and updated classrooms
- 21st century technology upgrades
Henneman Engineering Commissioning
- Full commissioning of all mechanical, electrical, and plumbing systems
- Tuned and verified daylight harvest
- Tuned and verified demand control ventilation strategies
Square Feet
101,200 square feet
Total Construction Budget
$30,000,000
Additional Higher Education Projects
-
Waukesha County Technical College, Engineer of Record
Pewaukee, Wisconsin -
University of Wisconsin-Platteville, Williams Fieldhouse Addition
Platteville, Wisconsin -
Madison College, EVOC Facility
Columbus, Wisconsin -
University of Illinois, Henry Administration Building
Urbana-Champaign, Illinois -
University of Illinois, Davenport Hall
Urbana-Champaign, Illinois -
Illinois State University, Julian Hall Data Center
Normal, Illinois